Filed
Funding file
Foley Adds Downtown District to $25,000 Facade Grant Program
Foley expanded its facade grant area on Nov. 16. Eligible owners and tenants can request matching funds for exterior upgrades, with awards capped at $25,000 on a first-come basis.

Key points
- The City Council approved the district expansion on Nov. 16.
- Grants start at $1,000 and are capped at $25,000 per project.
- Applicants must match grant support dollar for dollar; the city reimburses up to 50% of eligible costs.
- The maximum equals the greater of $5,000 or $5 per square foot of improved primary facade.
- Awards are first-come, first-served, with one award allowed per building every five years.
Foley now offers facade grants up to $25,000 across an expanded downtown area.
The City Council approved the expansion on Nov. 16. It adds the Extended Downtown District to the Facade Improvement Incentive Grant Program and extends access beyond the three previously covered districts.
The former service area comprised the Local Downtown Historic District, the National Register Historic District, and the Foley Downtown Overlay District, while the program supports downtown revitalization and historic preservation through exterior improvements.
The new Extended Downtown District surrounds the overlay district and includes nearby areas around the established downtown areas. The expansion opens the program to more storefront upgrades in the blocks around downtown.
Planning Director Shawn Mitchell said: “Downtown doesn't stop at the edge of the overlay district, and neither should this program.” He also said: “The businesses on the blocks around downtown are part of the first impression visitors get of Foley.”
Who can apply in the expanded area?
Property owners and business tenants may apply for grants on existing buildings located on commercially zoned properties within the grant area. Qualifying mixed-use buildings are also eligible. A tenant must submit the property owner’s written permission with the application.
A building’s certificate of occupancy, the city approval allowing the building to be occupied, must have issued at least 12 months before the application date. That rule remains part of eligibility in every covered district.
For applicants, the expansion requires a location check as well as the building checks that already applied across the three established districts under the program. They must confirm commercial zoning, mixed-use eligibility where relevant, occupancy approval timing, and tenant permission before submitting an application.
How much money is available?
Grants start at $1,000. The applicant must provide a dollar-for-dollar cash match, meaning one dollar of applicant cash for every dollar of city grant support. After a final inspection and review of the required documentation, the city reimburses up to 50% of eligible project costs.
The award maximum equals the greater of $5,000 or $5 per square foot of the improved primary facade facing a named public right-of-way, a designated public travel route. No project can exceed $25,000.
For a small facade, the $5,000 floor can control the award; for a larger improved facade, the per-square-foot calculation can raise the maximum until the $25,000 project cap applies. Applicants should separate the total project budget from the grant ceiling. The city reimburses only eligible costs and only up to 50%.
Payment follows the stated reimbursement process: eligible spending, final inspection, documentation review, then city reimbursement.
What does the expansion change?
The decision changes where the program can reach, not the basic funding terms. The $1,000 starting grant, cash match, 50% reimbursement, $25,000 maximum and five-year award interval apply across the expanded area.
Applicants now have four practical checks before filing:
- The property must sit in the Extended Downtown District or one of the three previously covered districts.
- The building must be an existing, commercially zoned property, and qualifying mixed-use buildings remain eligible.
- Tenant applicants need the property owner’s written permission.
- The certificate of occupancy must have issued at least 12 months before the application date.
Applicants should also confirm that the proposed improvement affects the primary facade facing a named public right-of-way. The square-foot formula applies to that facade, not the building’s total exterior area.
Awards run first-come, first-served as funding allows. Each building can receive one award every five years, while the $25,000 ceiling applies to each project. Because funding is limited and awards operate on a first-come, first-served basis, eligible applicants have a practical reason to confirm coverage and readiness before submitting.
Interested property owners and tenants can contact the City of Foley Planning and Development Services at 251-952-4011 to confirm eligibility before starting an application. The city still requires the tenant permission and occupancy documentation described above.
via Google News: Federal Grants (Source)
More from Nathan Brooks
Show full bio
Staff writer covering regulation, policy and their impact on grant writers, development directors, researchers and grants administrators at Grants News.
22 articles